contact us 020 8534 4441 enquiries@mehltd.co.uk

Religious Orders

rel

MEH are Providers of a Dedicated Service to Religious Orders

We have taken on a range of issues for Religious Orders, Temples and Churches, allowing for minimum disruption of the day to day activities of the organisation. Our staff are trained to deal with problems effectively, in a discreet and respectful manner, ensuring that all debris is removed from site, and sites are left in a clean and safe condition.

Register for FREE Helpline Access 24/7

Your breakdowns don't have to cost you a penny. Our free help line is available to discuss these with you and possibly guide you to solve the problem yourself. Alternatively we can send out an engineer to respond to your problem in a short timescale.

How our PPM / Service & Maintenance Teams Operate

The Operations Manager is Mark Wood who has been with our organisation for 23 years with several qualifications including BTEC National Certificate in Building Services Engineering and NEBOSH Construction Certificate in Health & Safety.

His Team units consist of a Service Manager, an Assistant and a Supervisor. The Supervisor monitors our engineer's performance for appearance, time keeping, cooperation, quality and cleanliness and organises any major re-active repairs programmes.

24 / 7 Help Line Desk

We operate a manned 24 / 7 Help Line Desk where any required emergency visit is passed to an engineer within minutes of receipt and attendance on site within 2 hours subject to road and weather conditions.

All of our works are IT managed via engineers PDA's with hard copy paper reports for copies to tenants or our client's site representative who actually confirm the hours spent on site against which any charges are based. Each unit's operators can readily provide answers from this system to questions raised.

Our IT system maintains condition report asset schedules for every piece of equipment within any Service & PPM Maintenance Contract being operated. This enables us to monitor when it's time to replace any item of plant rather than continually repairing it and to provide clients with future replacement budget needs.

Managers and Supervisors make regular visits to clients offices for general discussions on things going on, performance, future needs etc unless this is covered by formally arranged meetings.

Our engineers are security cleared and mostly multidisciplinary. They have coloured ID badges and company PPE and drive similarly matching vehicles stocked with commonly required spares to avoid time and expense on shopping trips. They also have an abundance of dust sheets and a vacuum cleaner for ensuring tidiness during and after completion of the work, including clearance from site of all rubbish and replaced plant.

  • All PPM or breakdown visits are regularly and promptly organised with the site to suit programmes or urgencies of breakdowns with the sites being advised should any delays become inevitable due to circumstances beyond our control.
  • We have a network of suppliers to minimise down time and travelling costs.
  • All equipment is maintained in accordance with the manufacturers recommendations, including any parts required.
  • Reports, estimates and invoices are provided within 7 days or earlier should situations require this.
  • Fault finding tasks are undertaken by our engineers with support from a senior engineer if required. Fully detailed reports and any recommendations are promptly provided.
  • Programmes are developed for any statutory testing or tasks we are requested to manage of any incumbent contractor and shared with the client for agreement.
  • We hold regular in house meetings with any specialist / incumbent contractors our clients ask us to manage and provide minutes of these back to them.
  • Our technical engineers are always available to review with clients any feasibility discussions or general chats or ideas they might want to have.

Mechanical Services

Plumbing and Heating
Steam & Condense
Gas
Soil, Waste and Rainwater
Boilers
Air Handling Units
Air Conditioning
Ventilation
Fume Extract
Kitchen Canopies
Water Tank and Legionella
Prevention
Oil into Water, Gas & Oil
HT/MT/LT Heating
Fire Mains
District Schemes
Combined Heat & Power (CHP)
Commercial Kitchens
Water Treatments
Heating & Cooling
Ductwork including cleaning
Chimney & Flues
In Situ Welding Repairs
Stainless Steel Process Installations

Electrical Services

Power & Lighting
CCTV
UPS & Emergency Lighting
Street Lighting
PAT Testing
Test & Reports
Nurse Call System
Kitchen Equipments
Security & Fire Alarms
Door Entry
Lighting Conductors
Communications & Data
Control Panel
Energy Conservation Controls
Flood & Lighting

Next Case Study
Previous Case Study
You can view case studies related to this sector below, alternatively view all our case studies on our Past Work page.
St Mary Magdalene Church

MEH value every customer, large or small. We have provided St Mary Magdalene Church with various services over the years. One such service was removing the existing plant room and replaced the boilers, controls, pumps and overcame a difficult flueing problem to achieve a compatible installation accommodating quietness of use and aesthetics sympathy with such a magnificent building. Additionally we modified the system to provide sectionalised use with reduced energy bills.  We have repaired and serviced their gas burner and carry out their annual gas safety checks. MEH are readily available for all our customers' needs irrelevant of their size.

St Johns Church - Hyde Park
  • LocationHyde Park - London
  • ConsultantsDavid Miles & Partners

The south tower of the church was refurbished in order to provide WC facilities and a boiler room.

This project involved the re-ordering and provision of underfloor heating and WC facilities. It was our job to install underfloor heating to the Nave, aisles and the sanctuary area.

We also carried out the electrical works associated with the renewal of the floor in the main part of the church for example new power points, power for specialist systems, the disconnection and removal of existing redundant electrical systems. We carried out all final testing, certifications, commissioning and handing over.

All works had to be completed whilst the nursery to the east end of the Church remained in use for the duration of the contract. All work was carried out with minor disruptions to the church and vicarage and completed within the time frame.

Our Lady Star of the Sea - Roman Catholic Church

This was a very complicated extraction of an existing boiler. The existing boiler was a brick plenum chamber which had asbestos lining. It was carefully taken down by asbestos removal specialists. After the floor had to be levelled, raised and filled.

The existing boiler was taken out and a new air handling plant was installed with its own boiler connected to the existing duct work feeding the church. The return air incorporated heat recovery and all the controls were located in the vicarage.

All work was carried out with minor disruptions to the church and vicarage and completed within the time frame.

free register

We have worked with MEH Facilities Ltd for many years on a range of Domestic and Commercial Measured Term Contracts ranging from Ventilation, Electric Heating, Domestic Gas Central Heating, and large District Heating System. We have always been happy with the services provided. In addition to their own contracted areas they also provided back up service to our own direct labour organisation. The quality of the workmanship and the professionalism of the staff were excellent at all times.

Gary Penticost - Hackney Homes

"MEH Facilities Ltd have consistently provided us with an efficient and reliable range of services whilst achieving good value for money.

Through their Gas Servicing Division they have helped us attain 100% compliance with our Landlord Gas Safety Records and developed both electronic record keeping and internet access."

Richard Bryan - Reinvestment Coordinator Soho Housing

"MEH Facilities Ltd have carried out some difficult projects on our behalf during our association, keeping services operational whilst successfully carrying out major works. We have found them to offer a user friendly and flexible approach at competitive prices."

Roger Brooks - Facilities Manager, Tower Hamlets PCT Estimates and Facilities Department

"The project ran smoothly and finished on deadline completion"

Ralf Wong - London Borough of Richmond upon Thames

"We have worked with MEH Facilities Ltd on various projects in recent years, including several major works where services were required to be kept operational throughout. Even on particularly difficult projects this has been achieved, all with a friendly and flexible approach from all involved. The current project we envisage completion on time as usual"

Forest Gate Construction