Client: Mitchells & Butlers
Value: £12,000
The project was to replace and upgrade the heating and hot water boiler within the manager’s accommodation and to replace the heating and hot water boiler within the plant room, which serves the bar and restaurant areas.
The pipework in the plant room serving the bar and restaurant areas needed to be reconfigured to incorporate a low loss header and pumps to serve the various zones. The existing floor standing boiler was replaced with two wall mounted condensing boilers to improve the energy efficiency of the system.