Grasmere Primary School

Grasmere Primary School

Value: £16,000

MEH Facilities were commissioned by Ensigna Construction Ltd on behalf of Hackney Learning Trust to carry out this challenging contract during the 2014 school summer holiday period.

The contract covered electrical refurbishment works to this pre war built school within the six week summer holiday period and the works comprised:

  • The installation of a new addressable fire alarm system
  • Rewiring of the external toilets
  • Rewiring of the kitchen.

The fire alarm works involved stripping out the existing system and installing a fully addressable system that included a new control panel and new smoke and heat detectors, wired in surface fixed FP 200 cable.

The new fire alarm system was successfully installed and commissioned in the contract period.

The work in the external toilets included stripping out the existing electrical installation, installing a new distribution board, new lighting and time switch controls for the existing heating and water heating. The installation was carried out in PVC cables run in surface fixed galvanised steel conduit.

The rewiring of the kitchen was carried out using the existing steel conduit with extensions to additional socket outlet positions.

All works were successfully planned, programmed and completed in the contract period before the school returned from the summer break.