Case Studies & Testimonials
CASE STUDIES
The Norwood School (click to read case study)
 |
Project Location Client Consultants Start Date Completion Date Value |
The Norwood School Crown Dale, London, SE19 3NY London Borough of Lambeth Trevor Childs, Fredrick Snow & Partners 1st October 2008 17th April 2009 £ 232,921 |
Norwood School works consisted of the replacement of defective pipework, fittings, valves, expansion bellows and bracket ranging from 15mm - 150mm within the district distribution scheme running in ducts from the main plant room, connecting and serving the schools modern design.
This job required careful management and time efficiency. On site at the same time as us, asbestos was being cleared ahead of our works and therefore all surveys were unable to be carried out by ourselves and the consultant. When access became available we commenced our works, which had to be phased over the term to enable the full use of the school. This was very successful. Unfortunately we also discovered a problem with the red oxide paint of hot water pipes causing the production of toxic fumes. A strict health and safety method statement was implemented involving breathing protection and ventilation air being forced in and out of the ducts.
The discovery of completely rotten pipework meant a lot of fabrication and longer hours out of school time, to insure these could be replaced without causing disruption to the school. Once all new installations were in place and tested, follow on insulation was applied.
Throughout this project not one school day was lost or access denied. The project was successfully completed within the 6 months programme.
Glenbrook Primary School (click to read case study)
 |
Project Location Client Consultants Start Date Completion Date
Value |
Glenbrook Primary School Clarence Avenue, Clapham Park, SW4 8LD London Borough of Lambeth July 2008 Two phase completion Summer Holidays 2008/Christmas Holidays 2008/09 £ 122,076 |
This project was working directly for the London Borough of Lambeth as the Main Contractor, on behalf of the school. The works were split into 2 phases over the school holidays, consisting of a new kitchen canopy, extractor fans and duct work. To also include the removal of asbestos and all existing concealed heating units.
We installed a sill-line 'Thermal' heating system, which was customised specifically for the school. This was supplied for one half of the school, consisting of 11 class rooms and corridors.
The Project was completed within the time frame.
Jenny Hammond Primary School (click to read case study)
 |
Project Location Client Consultants Start Date Completion Date Value |
Jenny Hammond Primary School Worsley Road, Leytonstone, London Forest Gate Construction N/A 26th May 2009 August 2009, phased works £ 20,567 |
The Jenny Hammond Primary School is an existing building; the works comprised a 100m2 extension block to facilitate the new staff room, offices and reprographics and the refurbishment of part of the existing building.
The extension block accommodates new bathroom and kitchen facilities with services extended from the existing building. The refurbishment of the existing building included the stripping out and installation of new W.C's and tea stations in new locations and associated works in relocating facilities.
We were responsible for undertaking the mechanical installations; above ground drainage, below ground drainage, domestic hot and cold water, rainwater, gas servicing, heating and ventilation.
Chase Bridge Primary School (click to read case study)
 |
Project Location Client Consultants Start Date Completion Date Value |
Chase Bridge Primary School Kneller Road, Twickenham, TW2 7DE Ralf Wong, London Borough of Richmond upon Thames 27th July 2008 September 2008 £ 140,000 |
Chase Bridge Primary School was a refurbishment project, which commenced during the school holidays. The scope of works consisted of the renewal of heating mains, radiators and Fan Coil Units fed from outside heating mains on the roof.
We were commissioned as the main contractor to include all building work, painting, decorating and asbestos removal.
London & Quadrant Housing Association (click to read case study)
 |
Project
Client |
Measured Term Contract for Maintenance of Gas Appliances and Associated Systems in Domestic Properties London & Quadrant Housing Association |
We are very proud of our long term association with London & Quadrant, having worked for them since the start of our initial contract in April 2001.
The first contract was initially for a 3 year period and we were able to negotiate extensions to the contract based on fixed cost and performance.
We were very proud to be awarded Contractor of the Year 2005-6 for which we were picked from approximately 200 contractors.
We also received praise for our efforts in assisting London & Quadrant achieve 100% Compliance in Landlords Gas Safety Certification for our contract area which is a level they have now become accustomed to.
The contracts with London & Quadrant were re-tendered in 2007-08 and we were successfully awarded a fresh contract in April 2008 which runs until March 2013.
Mile End Hospital (click to read case study)
 |
Client
Consultants |
Tower Hamlets PCT Estimates and Facilities Department Mile End Hospital London E1 4DG |
A very complicated installation to de-centralise the existing steam generating plant that required detailed complex planning to retain all existing heating, hot & cold water and gas services to this bed hospital that incorporates a day-care centre.
This involved the creation of 3 large independent LTHW plant rooms comprising of modular boilers and new flues, associated control panels linked to BMS, pumps, motorised valves etc.
The work was further complicated by asbestos removal and the fact that a number of services were almost untraceable. Before any removal, adaptation or interception could take place numerous investigative exercises had to be carried out to avoid inadvertent disruptions to the hospitals operations and careful programming where this was unavoidable.
In support of our works we had 3 large portable gas boilers and freezer based lorries working throughout this process. The entire contract was completed within 15 weeks.
SOHO Housing Association (click to read case study)
 |
Client Project |
SOHO Housing Association Measured Term Contract for Maintenance of Gas Appliances and Associated Systems in Domestic Properties |
We have been working with Soho Housing Association since June 2005, initially on a three year Measured Term Contract to carry out Annual Servicing and Reactive Maintenance to Gas Appliances and associated systems in Domestic Properties located in and around central London.
Our efficient operations have enabled us to gain 100% Compliance in Landlords Gas Safety Certification on behalf of Soho Housing Association. Our electronic records and web access to our database enable them to view real time information regarding their service and repairs. We now adopt a partnered approach to working with Soho Housing Association.
Harrow Leisure Centre (click to read case study)
 |
Client Consultants |
Margaret Rutkowska Ingleton Wood |
A tricky task to remove 4 existing 100mm heating circulation pumps and replace with new dual sets including their isolation valves, electrical supplies and BMS connections.
The centre operates 7 days a week and our only window was from 23:00 - 06:00 hrs. A major task was to insert new isolation valves onto a 200mm common mains so that we could work away from the mains onto individual pump sets.
Working with our appointed freezer partner we had to monitor the rate of temperature decrease in these mains from 23:00 hrs so that they could calculate the freeze and actual operating time for us to weld the flanges and install the valves, before returning the system back to operation before the 06:00 hrs start up.
Although complicated, the work was completed without any disruption to the centre, which is one of the largest in Europe.
TESTIMONIALS
The Norwood School (click to read testimonial)
"Mid Essex Heating (London) Ltd has provided a consistent, highly professional service which has been continued throughout the project at Norwood School. This was an extremely difficult project with the works being carried out during term times in service ducts below the corridors of the school, with all services being interrupted to keep all heating and water services operational."
Trevor Childs, Sir Fredrick Snow & Partners
Glenbrook Primary School (click to read testimonial)
"MEH were professional and courteous. They completed the Installation on time and with the minimum disruption and mess to the running of the school."
Anthea Dalton, Head Teacher
Jenny Hammond Primary School (click to read testimonial)
"We have worked with MEH on various projects in recent years, including several major works where services were required to be kept operational throughout. Even on particularly difficult projects this has been achieved, all with a friendly and flexible approach from all involved. The current project we envisage completion on time as usual"
Forest Gate Construction
Chase Bridge Primary School (click to read testimonial)
"The project ran smoothly and finished on deadline completion"
Ralf Wong - London Borough of Richmond upon Thames
London & Quadrant Housing Association (click to read testimonial)
"I write to congratulate you on the excellent performance provided by your company. This resulted in your contract being a 100% rate service, including properties in the no access procedure.
This is the first time the trust has achieved this target, I can only express the Trust's pleasure and thanks to all of your staff for this excellent performance.
I am aware that this excellent performance has only been achieved by all parties working closely together and having a harmonious working relationship, which I am sure we will endeavor to maintain.
Once again thank you for your efforts; please pass our thanks on to all of your staff."
L&Q Group
Mile End Hospital (click to read testimonial)
"Mid Essex Heating (London) Ltd have carried out some difficult projects on our behalf during our association, keeping services operational whilst successfully carrying out major works. We have found them to offer a user friendly and flexible approach at competitive prices."
Roger Brooks - Facilities Manager, Tower Hamlets PCT Estimates and Facilities Department
SOHO Housing Association (click to read testimonial)
"Mid Essex Heating (London) Ltd have consistently provided us with an efficient and reliable range of services whilst achieving good value for money.
Through their Gas Servicing Division they have helped us attain 100% compliance with our Landlord Gas Safety Records and developed both electronic record keeping and internet access."
Richard Bryan - Reinvestment Coordinator Soho Housing
Harrow Leisure Centre (click to read testimonial)
"We have worked with Mid Essex Heating (London) Ltd on a range of projects which they have secured by competitive tender.
On each occasion we have found them to professionally and diligently undertake the required works some of which have been complex projects."
Mike Perschky - Project Manager
|  |
|